The process

From Your Electricity Bill to a Full Solar Proposal in 2 Minutes

⚡ Powered by Solar AI Engine

No guesswork. No generic estimates. Every number in your proposal is computed from real data — NASA satellites, live Meralco rates, and physics simulation — all processed by our proprietary Solar AI Engine.

1

Stage 1

Your Solar AI Engine proposal

You01

Tell us about your home

Enter your name, address, email, and mobile number. We use your address to pull real NASA satellite solar data for your exact location — not a regional average.

You02

Share your electricity usage

Upload photos of your Meralco bills (up to 12 months) or simply type your average monthly bill amount.

Bill photos are processed by our multi-model AI system that extracts your kWh usage and rate per kWh. A consensus mechanism verifies and selects the most accurate reading across multiple models.

Our engine03

NASA satellite data for your location

We query the NASA POWER API for 22 years of solar irradiance data at your GPS coordinates. This gives us your site-specific Peak Sun Hours (PSH) — the single most important input for accurately sizing a solar system.

PSH varies significantly across the Philippines — from 4.6 in parts of Mindanao to 5.4 in Visayas. Using your actual coordinates instead of a regional average improves proposal accuracy by 15–20%.

Our engine04

Physics simulation with our solar simulation engine

We run a full physics-based solar simulation using industry-standard engineering models and real hourly weather data for your location.

The simulation produces a 12-month yield profile showing how much energy your system will generate each month, accounting for cloud cover, temperature, panel tilt, and system losses.

Our engine05

25-year financial projection

We model your full financial picture over 25 years — the life of your solar panels. This includes loan amortisation, Meralco rate escalation, panel degradation, and CapEx milestones for inverter and battery replacements.

You receive06

Your personalised PDF proposal

A professional 2-page proposal delivered instantly — with 3 system tiers (Budget, Balanced, Premium), all-inclusive hardware pricing, monthly savings projections, and a 25-year cashflow chart.

The financial model

Assumptions behind your 25-year projection

Net metering frameworkRA 9513 + ERC Resolution No. 9-2013
Buyback rate used₱6.00/kWh (Meralco blended generation rate)
Self-consumption assumed50% residential · 80% commercial
Panel degradation0.5%/year (Tier 1 manufacturer warranty standard)
Utility escalation5%/year (10-year Meralco historical average)
Loan assumption10 years at 7% p.a. monthly amortisation
CapEx milestonesInverter replacement Year 11 · Battery Year 10 (hybrid) / Year 8 (off-grid)
Projection horizon25 years — standard Tier 1 panel warranty period
2

Stage 2

Site visit & installation

Our team contacts you

One of our solar consultants will reach out within one business day to answer your questions and schedule a convenient time for the site visit.

Free site visit

Our engineers visit your home to assess your roof — measuring orientation, tilt, shading, and available surface area. We also confirm your electrical panel setup and Meralco connection type.

Final engineered proposal

Using your actual roof data, we produce a final installation proposal with confirmed hardware, BOS costs, and a signed engineering assessment — ready for contract.

Installation

Our certified team handles everything — panel mounting, inverter installation, battery setup, grid connection, and Meralco net metering application under RA 9513. Under the 2025–2026 ERC and DOE reforms, notarization is no longer required, LGU permits are issued within 3–7 working days, and the overall process is faster.

Stage 2 is completely free and obligation-free

There is no cost for the site visit or the final engineered proposal. You only proceed to installation if you are fully satisfied with the final numbers and want to move forward.

How accurate is the AI proposal?

Within 10–15% of the final engineered quote for most homes. The main variable is your actual roof orientation and shading, which we measure precisely during the site visit.

Do I need to be home for the site visit?

Yes — our engineer needs access to your roof and electrical panel. The visit typically takes 45–60 minutes.

How long does installation take?

Most residential installations are completed in 1–2 days. The Meralco net metering application takes an additional 30–60 days to process.

Ready to see your numbers?

Get your free personalised solar proposal in under 2 minutes.

Get My Free Solar Proposal

Free · No sign-up required · PDF delivered instantly